Why we'll never hire Bradshaw Plumbing and Heating again
We lost our home in the 2021 Marshall Fire. While we were rebuilding, Bradshaw Plumbing and Heating billed us $12,519.50 for a boiler install we say we'd already paid for, then put a lien on our house and sued us.
Background
On December 30, 2021, the Marshall Fire tore through Superior, Louisville and unincorporated Boulder County on hurricane-force winds. In a single afternoon it destroyed 1,084 homes and damaged 149 more, about $513 million in losses (Denver7). Ours was one of them.
We lost the house that had been our home for 17 years, where our children were born and grew up. We lost family keepsakes and heirlooms that can't be replaced. We both ran businesses out of that house, and lost them with it, along with the income. And we lost years. The rebuild took three, spent in VRBOs, hotel rooms and rentals. All of our mental health suffered. The worst part was watching our kids suffer.
Overnight, more than a thousand families needed builders, and contractors poured in. Some were good. Some were not.
Leona Scott, an Aurora contractor, took more than $1.3 million from four families rebuilding in unincorporated Boulder County and left their homes unfinished. He wasn't licensed to build homes in the county. He pleaded guilty to felony theft and in December 2024 was sentenced to 10 years in prison (Boulder County Sheriff, Denver7). Those families were in our neighborhood. Some of them are our friends.
In 2022, Statewide Restoration, a builder that had recruited fire survivors, shut down without warning and left its customers to start over with new builders (Denver7).
To be clear, Bradshaw was never accused of fraud or any crime. Ours was a civil billing dispute that ended in a settlement. But it's another way a rebuild can go wrong.
What happened
In 2023, Bradshaw wrote a contract to provide and install a boiler in our new home, and was paid in full. To us, "installed" means connected, commissioned and working. In 2026, after doing the work, he billed us another $12,519.50 for "combi-boiler install." When we refused to pay, he put a lien on our house and sued us.
We paid for an installed boiler. Three years later, "installed" apparently meant hung on the wall, like some kind of bizarre modern art. That definition was his, not ours. In his emails and his lawsuit, Bradshaw said "install" meant hanging the boiler and running its gas and flue, and that connecting it to the heat and hot water was extra. He first put that in writing in May 2026, three years after he wrote the contract and after the work was done. And it doesn't match how he handled the other six "providing and installing" items in the same contract, which he left connected and working. We don't know anyone else who uses the word that way. That's how we see it, and here's why.
Every quote below comes from a document listed under Exhibits. The opinions are mine.
What he wrote, and what he was paid
Todd Bradshaw wrote and signed Heating Revision #2, a $94,677 lump-sum contract to "furnish material and labor" for a complete hydronic heating system in our new house. Here's his list:
– Providing and installing 1 SpacePak air-to-water heat pump
Heating Revision #2, signed 4/18/2023 (Exhibit 1)
– Providing and installing 1 50 gallon buffer tank
– Providing and installing 6 digital, programmable thermostats
– Providing and installing glycol feeder
– Providing and installing glycol
– Providing and installing supply & return piping to 2 air coil fan units …
…
– Providing and installing 1 Triangle Tube Combi boiler
Seven items, same words. To me, and I'd bet to anyone, "installed" means connected, commissioned and working. Six of them he left that way, at no extra charge. The seventh, the boiler, came with a $12,519.50 bill. If "installing" didn't mean connected and working, why did he connect and commission the other six? And if it did, why not the seventh?
He also knew how to write an exclusion. The same contract has a "Does not include" list: high-voltage wiring, roof patching, permits, heat transfer plates, floor insulation and concrete prep. If connecting the boiler wasn't part of the job, that's where it would go. It isn't there.
And he knew how to write "later" when he meant later. Two months before this contract, in his plumbing contract for the same house, he wrote that it "Includes gas to: – 1 future boiler/combi-water heater" (Exhibit 2). There is no "future" on the boiler line in the heating contract.
The contract was paid in full in September 2024 (Exhibits 3, 3a). He agrees:
I think you are 100% paid up on the original contracts.
Text message from Todd Bradshaw, May 11, 2026 (Exhibit 5)
Then he billed us to install it anyway
The boiler went in during March and April 2026. On May 11 he sent Invoice 3655 for $12,519.50. Its first words:
Billing for combi-boiler install to provide suplemental heat for heating system and domestic hot water system. Boiler install, including gas piping and flue work, paid previously to BPH. This invoice includes piping from boiler/combi to heating and domestic hot water system, including: piping, isolation valves, pumps, glycol, controls and labor.
Invoice 3655, 5/11/2026 (Exhibit 4)
"Billing for combi-boiler install." The install he had already contracted for, and been paid for. His position was that the part he'd been paid for was only the hanging, and the connecting was extra.
How he redefined "install"
The word "install" sat in his contract, unqualified, for three years. Nobody defined it in writing until he sent the bill. I never felt the need to; to me, and I think to most people, what it means is obvious. Then his definition kept moving:
- April 2023, his contract
- "Providing and installing 1 Triangle Tube Combi boiler." No qualifier, same words as the six components that were fully connected.
- May 11, 2026, his invoice
- "Boiler install, including gas piping and flue work, paid previously." Install now means hang, gas and flue; connecting it is billed separately.
- May 19, 2026, his email
- "Installing a boiler simply referred to the hanging, fluing and gas attachment, and that was all." And: "I do understand your confusion by the vagueness. I used the word, 'install' as a very generic term, as plumbers do, for the hanging, etc. For insurance purposes …" (Exhibit 6)
- July 7, 2026, his attorney's demand letter
- The original scope was "the boiler itself and the work necessary to hang it." (Exhibit 8)
- August 7, 2026, his lawsuit
- "Install" means "hanging the Combi Boiler on the wall and gas piping and flue work." (Exhibit 10)
His insurance company's definition of "installed" isn't in the contract. Neither is any of the rest. He wrote the contract. If he meant "hang it on the wall," he could have written that.
He also pointed to a November 2022 email about prepping for a boiler that might be added later. That email came five months before the contract was signed. The contract he wrote afterward says "providing and installing."
What he said the bill covered
Suppose we accepted his definition of "install," which we don't. The bill still doesn't hold up on his own terms. He said twice that hanging, flue and gas were not on it:
The invoice is for the work we've done but does not include Providing and hanging the boiler, flue work or gas piping
Text message from Todd Bradshaw, May 11, 2026 (Exhibit 5)
[An employee] did not begin his T&M recording until he had hung the boiler, piped the flue and ran the gas. Those 3 tasks were done first, and did not count towards any T&M invoicing.
Email signed by Todd Bradshaw, May 19, 2026 (Exhibit 6)
The invoice's labor, as itemized (Exhibit 4):
| Date billed | Hours | Rate billed |
|---|---|---|
| 3/13/2026 | Technician A 8, Technician B 8 | $155 / $120 |
| "3/22/26" (a Sunday) | Technician A 3.5 | $155 |
| 3/31/2026 | Technician A 7 | $155 |
| 4/1 – 4/7/2026 | Technician A 30.5, Technician C 5.5 | $155 |
| Total | 62.5 hours | $9,407.50 |
Our security cameras show what some of those hours were. On the day billed as "3/22" (the work was actually March 25), the boiler was already partly on the wall, and the crew spent the morning on the flue. That day is billed as 3.5 hours of time and materials. On March 31, the footage shows the gas being hooked up between about 9:20 and 10:00 a.m. That day is billed as 7 hours. Hanging, flue and gas are the three tasks he said "did not count towards any T&M invoicing." The cameras weren't recording yet on March 13, the day the boiler was delivered. That day is billed as 16 hours.
His contract sets labor for extra work at $120 an hour. He billed 54.5 of these hours at $155.
To me, it's plain: he billed us for the very work he said he didn't bill us for.
Then the lien, then the lawsuit
I disputed the invoice in writing on June 10. I asked for any signed change order and offered to look at a revised bill for anything that really was outside the contract (Exhibit 7).
He didn't revise it. On June 25 he swore before a notary that $12,519.50 plus interest was owed, "true and correct, to the best of my knowledge, information and belief," and on July 8 recorded that lien against the house we rebuilt after the fire (Exhibit 9). He never reduced it by a dollar.
On August 7 he sued my wife, me, and our family trust in Boulder County Court (Exhibit 10).
How it ended
- Settled October 14, 2026. Dismissed with prejudice.
- Bradshaw received $3,112, about 25% of the $12,519.50 he swore was owed. That's the same figure as the materials line on his invoice. No interest, no attorney fees.
- Lien released.
- Bradshaw has no further warranty obligation on the work.
The settlement has no confidentiality term.
On top of everything the fire took, this fight cost us hundreds of hours and thousands of dollars in legal fees. We settled a lawsuit we believe was unjust because settling was still cheaper than taking it to trial.
Needless to say, Todd and Tracey Bradshaw are not welcome in our home. In my opinion, Todd Bradshaw is a sleazy contractor and a litigious bully. We won't hire Bradshaw Plumbing and Heating, LLC, or any other business either of them owns, and we wouldn't recommend them.
If you're rebuilding
- Get a two-way attorney-fees clause. Make sure the contract says whoever loses a dispute pays the other side's legal fees. Ours had a fee clause, but it only protected the contractor (Exhibit 1, page 2). That contract was between him and our builder, not us, so it was unclear whether the clause could reach us at all; our builder had acted on our behalf in some respects. It was one more risk we didn't want to test in court. Without a clause that runs both ways, it can be cheaper to settle a claim you believe is wrong than to win it. That's what happened to us.
- Read any arbitration clause carefully. Arbitration is often sold as the cheap option. It's usually faster, not cheaper: you still pay your attorney just as much, and you also split the arbitrator's fees. In court, the judge's time costs you nothing.
- Keep every text and email. Ours turned out to be the best evidence we had.
- If a contractor records a lien, get a lawyer right away. Lien deadlines are short and strict.
For the dates in order, see the full timeline.
Exhibits
Personal contact information, account numbers, and employees' names are redacted.
- Heating Revision #2, signed 4/18/2023
- Plumbing Revision #1, signed 11/22/2022
- Final billing, 9/3/2024; 3a: payment, 9/17/2024
- Invoice 3655, 5/11/2026
- Text messages with Todd Bradshaw, Dec 2025 – May 2026
- Bradshaw email, 5/19/2026, with labor log
- My written dispute, 6/10/2026
- Demand letter, 7/7/2026
- Statement of Lien, Rec. No. 04139145
- Complaint, Case No. 2026C32494